TOP
0
0
【簡體曬書區】 單本79折,5本7折,活動好評延長至5/31,趕緊把握這一波!
Shadow Factories ─ Britain's Production Facilities and the Second World War
滿額折

Shadow Factories ─ Britain's Production Facilities and the Second World War

定  價:NT$ 1575 元
領券後再享88折
無庫存,下單後進貨(到貨天數約30-45天)
可得紅利積點:47 點
相關商品
商品簡介

商品簡介

Wartime is costly. Whilst the human cost is a burden which remains part of our every waking thoughts for many years after the end of the conflict, the physical cost, at least in some cases, is easier to deal with.Some, if not most of the physical cost of war, is spent in the constant supply of materials including armaments and machines to the troops – wherever they happen to be fighting. Of course the Services have always needed supplies of uniforms, equipment and machines. However, the rate of expansion of the Services and the rate of consumption of armaments increases dramatically in wartime. Pre-war traditional manufacturers simply could not cope with the sudden increase in orders. The only solution was to fabricate what was needed, in the Second World War at least, in additional factories. Shadow Factories was the term used to describe the use of third party factories and equipment used to manufacture components or complete units which were then passed on to the Services. These units could be anything from tanks, parts of aircraft to small pumps or rifles. The list was almost endless.Clearly it would be impossible to walk into the nearest engineering shop and expect them to manufacture heavy components. The railway yards were used to dealing with heavy blocks of metals and so they were approached to help with heavier vehicles such as tanks. Similarly the motor manufacturers were asked to help out with producing trucks and jeeps, for example.Of course this need necessitated formal contracts, and as far as possible discretion so that the German bombers could not locate and destroy vital sources of supplies. In some cases, such was the level of secrecy that components for aircraft for example, were fabricated in a number of shadow factories and assembled in a different location. In that way the exact engineering drawings could be more easily controlled and a stray bomb would only destroy part of the plans and planes. Where relevant, examples are provided from across the United Kingdom and cover an extensive range of machines and vehicles. Some details will also be provided concerning armament shells, some of which were made in one site and filled in other facilities. The government departments were certainly kept busy keeping track of it all!

您曾經瀏覽過的商品

購物須知

外文書商品之書封,為出版社提供之樣本。實際出貨商品,以出版社所提供之現有版本為主。部份書籍,因出版社供應狀況特殊,匯率將依實際狀況做調整。

無庫存之商品,在您完成訂單程序之後,將以空運的方式為你下單調貨。為了縮短等待的時間,建議您將外文書與其他商品分開下單,以獲得最快的取貨速度,平均調貨時間為1~2個月。

為了保護您的權益,「三民網路書店」提供會員七日商品鑑賞期(收到商品為起始日)。

若要辦理退貨,請在商品鑑賞期內寄回,且商品必須是全新狀態與完整包裝(商品、附件、發票、隨貨贈品等)否則恕不接受退貨。

定價:100 1575
無庫存,下單後進貨
(到貨天數約30-45天)

暢銷榜

客服中心

收藏

會員專區