商品簡介
本書包含了熱能與動力工程專業的基礎知識和專業知識,介紹了近年來該領域的新發展和新技術。書中正文和閱讀材料來源廣泛,涉及的專業英語詞匯量多,專業特點突出,內容豐富。全書共分九章,除第一章為熱能與動力工程專業的基礎知識外,其余八章分別介紹了鍋爐、汽輪機、火力發電廠、熱工自動化、發電廠集控運行、燃氣輪機與聯合循環、制冷與空調、環境工程等內容。各章后的閱讀材料包括科技寫作、英文專業期刊投稿、專利申請、技術轉讓、國際行業標準與規範介紹、簽證申請、國外大學研究生入學申請、專業人員簡歷、單位及轉換與專業常用縮寫詞等。
本書可作為高等學校本科熱能與動力工程專業的專業英語教材,也可作為高職高專電力技術類、能源類及相關專業的專業英語教材,還可供工作在這一專業領域內的工程技術人員和管理人員閱讀參考。
目次
Chapter 1 Introduction to Thermal Sciences
1.1 Fundamental of Engineering Thermodynamics
1.2 Fundamental of Fluid Mechanics
1.3 Fundamental of Heat Transfer
Exercises
Reading Materials
1 Instructions for Authors of Heat Transfer Engineering
2 Introductions of Department and Specialty
3 Types of Flowmeters
Words and Expressions
Abbreviations
Chapter 2 Boiler
2.1 Introduction
2.2 Development of Utility Boiler
2.3 Fuel and Combustion
2.4 Pulverizing System
2.5 System Arrangement and Key Components
2.6 On-load Cleaning of Boilers
2.7 Energy Balance
Exercises
Reading Materials
1 Supercritical and Ultra-supercritical Power Generation Units
2 Universal Pressure Boiler for Pulverized Coal
3 Spiral Wound UP Boiler for Pulverized Coal
Words and Expressions
Abbreviations
Chapter 3 Steam Turbine
3.1 Introduction
3.2 Casing Construction
3.3 Turbine Rotors and Couplings
3.4 Turbine Blading
3.5 Condensing Systems
3.6 Supercritical Steam Turbine Technologies
Exercises
Reading Materials
1 Letter of Authority of Know-How
2 Certificate for the Transfer of Know-How
3 Introduction to ISO 9000 Series of Standards
Words and Expressions
Abbreviations
Chapter 4 Thermal Power Plant
4.1 Introduction
4.2 Modern Steam Power Plant
4.3 Main Systems and Key Components
4.4 Coal Gasification for Power Generation
Exercises
Reading Materials
1 The BOT Concept
2 Units and Conversions
3 What is Vision 21?
4 Boiler Maintenance Procedures
Words and Expressions
Abbreviations
Chapter 5 Instrumentation and Process Control
5.1 Introduction
5.2 Documentation and Symbols
5.3 Essential Boiler Instrumentation and Controls
5.4 Steam Turbine Control and Protection System
Exercises
Reading Materials
1 Application for a Temporary Resident Visa
2 Resume
Words and Expressions
Abbreviations
Chapter 6 Unit System Operation
6.1 Introduction
6.2 Basic Control Functions
6.3 Plant Operation from the Control Room
6.4 Burners Operation
6.5 Pressure Operation
6.6 Startup Systems
Exercises
Reading Materials
1 Graduate Admissions and Records
2 How to Apply for a European Patent
Words and Expressions
Abbreviations
Chapter 7 Gas Turbine and Combined Cycle Power Plant
7.1 Gas Turbine
7.2 Combined Cycle Power Plant
Exercises
Reading Materials
1 Building Cooling, Heating and Power Generation Systems
2 How to Write an Abstract
Words and Expressions
Abbreviations
Chapter 8 Air Conditioning and Refrigeration
8.1 Air Conditioning
8.2 Refrigeration
8.3 Cryogenics
Exercises
Reading Materials
1 Temperature Measurement
2 IIR Commissions (www. iifiir, org)
Words and Expressions
Abbreviations
Chapter 9 Environmental Control at Thermal Power Plant
9.1 Introduction
9.2 Ash Collection
9.3 Reducing Sulfur Oxides Emission
9.4 Reducing Nitrogen Oxides Emission
Exercises
Reading Materials
1 CO2 Emission Reduction
2 Mercury in Coal
3 Emission or Air Quality Standards in USA, Europe and Japan
Words and Expressions
Abbreviations
References
主題書展
更多主題書展
更多書展本週66折
您曾經瀏覽過的商品
購物須知
大陸出版品因裝訂品質及貨運條件與台灣出版品落差甚大,除封面破損、內頁脫落等較嚴重的狀態,其餘商品將正常出貨。
特別提醒:部分書籍附贈之內容(如音頻mp3或影片dvd等)已無實體光碟提供,需以QR CODE 連結至當地網站註冊“並通過驗證程序”,方可下載使用。
無現貨庫存之簡體書,將向海外調貨:
海外有庫存之書籍,等候約45個工作天;
海外無庫存之書籍,平均作業時間約60個工作天,然不保證確定可調到貨,尚請見諒。
為了保護您的權益,「三民網路書店」提供會員七日商品鑑賞期(收到商品為起始日)。
若要辦理退貨,請在商品鑑賞期內寄回,且商品必須是全新狀態與完整包裝(商品、附件、發票、隨貨贈品等)否則恕不接受退貨。